• DocumentCode
    3329630
  • Title

    On Distribution Asset Management: Development of Replacement Strategies

  • Author

    Begovic, Miroslav ; Perkel, Joshua ; Hampton, Nigel ; Hartlein, Rick

  • Author_Institution
    Sch. of ECE, Georgia Inst. of Technol., Atlanta, GA
  • fYear
    2007
  • fDate
    16-20 July 2007
  • Firstpage
    1
  • Lastpage
    7
  • Abstract
    The components of electricity networks are ageing. It is expected that within a horizon of 15 years, the performance will deteriorate significantly, while the costs for operating the networks will increase enormously. The main problem is that a significant part of the population of the assets is installed in the same period, resulting in a highly concentrated number of failures in a short time. The currently applied replacement strategy has to be revisited, in order to accommodate the effects of ageing assets: higher maintenance costs, high failure rates, and a steep increase of capital expenditure (CAPEX).
  • Keywords
    distribution networks; power system management; capital expenditure; distribution asset management; electricity networks; replacement strategies; Africa; Aging; Asset management; Condition monitoring; Costs; Power cables; Predictive models; Statistics; USA Councils; Uncertainty;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering Society Conference and Exposition in Africa, 2007. PowerAfrica '07. IEEE
  • Conference_Location
    Johannesburg
  • Print_ISBN
    978-1-4244-1477-2
  • Electronic_ISBN
    978-1-4244-1478-9
  • Type

    conf

  • DOI
    10.1109/PESAFR.2007.4498062
  • Filename
    4498062