• DocumentCode
    3332342
  • Title

    Advanced hybrid scheduling system for manufacturing

  • Author

    Tsukiyama, Makoto ; Mori, Kazuyuki

  • Author_Institution
    Mitsubishi Electric Corp., Amagasaki, Japan
  • fYear
    1991
  • fDate
    28 Oct-1 Nov 1991
  • Firstpage
    75
  • Abstract
    The authors describe an advanced scheduling method based on a constraint-based scheduling editor and a Petri-net simulator. The advantage of this method is that the human scheduler can debug the schedule through a comprehensive Gantt chart and process chart. Backward scheduling, which is one function of the constraint-based scheduling editor, is found to be a powerful tool for due date scheduling. Computational experience indicates that the proposed approach is promising for generating and modifying a schedule, and for dynamic scheduling to respond to factory state changes
  • Keywords
    Petri nets; manufacturing data processing; production control; Gantt chart; Petri-net simulator; backward scheduling; constraint-based scheduling editor; hybrid scheduling system; manufacturing; process chart; Computational modeling; Computer aided manufacturing; Discrete event simulation; Dynamic scheduling; Humans; Job shop scheduling; Manufacturing systems; Processor scheduling; Production facilities; Virtual manufacturing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Electronics, Control and Instrumentation, 1991. Proceedings. IECON '91., 1991 International Conference on
  • Conference_Location
    Kobe
  • Print_ISBN
    0-87942-688-8
  • Type

    conf

  • DOI
    10.1109/IECON.1991.239325
  • Filename
    239325