DocumentCode
3332342
Title
Advanced hybrid scheduling system for manufacturing
Author
Tsukiyama, Makoto ; Mori, Kazuyuki
Author_Institution
Mitsubishi Electric Corp., Amagasaki, Japan
fYear
1991
fDate
28 Oct-1 Nov 1991
Firstpage
75
Abstract
The authors describe an advanced scheduling method based on a constraint-based scheduling editor and a Petri-net simulator. The advantage of this method is that the human scheduler can debug the schedule through a comprehensive Gantt chart and process chart. Backward scheduling, which is one function of the constraint-based scheduling editor, is found to be a powerful tool for due date scheduling. Computational experience indicates that the proposed approach is promising for generating and modifying a schedule, and for dynamic scheduling to respond to factory state changes
Keywords
Petri nets; manufacturing data processing; production control; Gantt chart; Petri-net simulator; backward scheduling; constraint-based scheduling editor; hybrid scheduling system; manufacturing; process chart; Computational modeling; Computer aided manufacturing; Discrete event simulation; Dynamic scheduling; Humans; Job shop scheduling; Manufacturing systems; Processor scheduling; Production facilities; Virtual manufacturing;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Electronics, Control and Instrumentation, 1991. Proceedings. IECON '91., 1991 International Conference on
Conference_Location
Kobe
Print_ISBN
0-87942-688-8
Type
conf
DOI
10.1109/IECON.1991.239325
Filename
239325
Link To Document