DocumentCode
333561
Title
Integrating simulation based scheduling with MES in a semi-conductor fab
Author
Watt, Douglas G.
Author_Institution
AutoSimulations Inc., Bountiful, UT, USA
Volume
2
fYear
1998
fDate
13-16 Dec 1998
Firstpage
1713
Abstract
This paper discusses how simulation was used to evaluate and characterize the scheduling issues in a semiconductor fab and the subsequent implementation of an integrated scheduling solution. The scheduling system was integrated with the fab MES and a number of other data sources including an integrated machine standards database, preventative maintenance scheduling and a Kanban stage calculation worksheet. It generates the schedule automatically at intervals throughout the day, 7 days per week and is used directly by the shop floor operators. The solution enables the same data to be used for both scheduling and off-line simulation to provide continuous improvement by refining the simulation rules through “what-if” analysis
Keywords
computer aided production planning; digital simulation; production control; scheduling; semiconductor device manufacture; Kanban stage calculation worksheet; MES; data sources; integrated machine standards database; preventative maintenance scheduling; semiconductor fabrication; shop floor operators; simulation based scheduling; Analytical models; Databases; Drives; Enterprise resource planning; Job shop scheduling; Measurement; Medical simulation; Preventive maintenance; Production facilities; Routing;
fLanguage
English
Publisher
ieee
Conference_Titel
Simulation Conference Proceedings, 1998. Winter
Conference_Location
Washington, DC
Print_ISBN
0-7803-5133-9
Type
conf
DOI
10.1109/WSC.1998.746052
Filename
746052
Link To Document