    Synchronous unit testing and model validation in the WSCC. IEEE PES 1999 Winter Meeting Generator Testing-TransAlta generators

  • Author

    Kehler, John H.

  • Author_Institution
    ESBI Alberta Ltd., Canada
  • Volume
    1
  • fYear
    1999
  • fDate
    31 Jan-4 Feb 1999
  • Firstpage
    169
  • Abstract
    TransAlta Utilities in Alberta, Canada, has 29 generators that qualified to be tested as per the Western System Coordinating Council (WSCC) requirements for synchronous generator testing. This included 12 steam turbine generators and 17 hydro generators. TransAlta´s goals were to obtain as much information with the generators online and have a smooth efficient process to collect data when the generator was isolated from the grid. This paper discusses risk management, testing difficulties, test methodologies and test results
  • Keywords
    hydroelectric generators; machine testing; steam turbines; synchronous generators; turbogenerators; Canada; TransAlta Utilities; Western System Coordinating Council; hydro generators; risk management; steam turbine generators; synchronous generator testing; test methodologies; test results; testing difficulties;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering Society 1999 Winter Meeting, IEEE
  • Conference_Location
    New York, NY
  • Print_ISBN
    0-7803-4893-1
  • Type

    conf

  • DOI
    10.1109/PESW.1999.747446
  • Filename
    747446