• DocumentCode
    333869
  • Title

    Large frequency disturbances: analysis and modeling needs

  • Volume
    1
  • fYear
    1999
  • fDate
    31 Jan-4 Feb 1999
  • Firstpage
    554
  • Abstract
    The present paper summarizes the main conclusions of the CIGRE Task Force 38.02.14 work related to the analysis and the modeling needs of power systems under major frequency disturbances. Taken as a whole, the practical outcome of this Task Force is a set of technical specification guidelines to be taken into account when facing or suspecting large frequency deviations
  • Keywords
    power system faults; CIGRE Task Force 38.02.14; large frequency deviations; major frequency disturbances; power systems; technical specification guidelines; Alternators; Bones; Flashover; Frequency synchronization; Load flow; Load flow analysis; Power system analysis computing; Power system modeling; Protection; Topology;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering Society 1999 Winter Meeting, IEEE
  • Conference_Location
    New York, NY
  • Print_ISBN
    0-7803-4893-1
  • Type

    conf

  • DOI
    10.1109/PESW.1999.747514
  • Filename
    747514