DocumentCode :
3339851
Title :
Shortening changeover time — An industrial study
Author :
Trojanowska, Justyna ; Zywicki, Krzysztof ; Varela, Maria Leonilde R. ; Machado, Jose M.
Author_Institution :
Manage. & Production Eng., Poznan Univ. of Technol., Poznan, Poland
fYear :
2015
fDate :
17-20 June 2015
Firstpage :
1
Lastpage :
6
Abstract :
This paper presents the results of the use of the Single Minute Exchange of Die method to shorten changeover time on machines in a polish production company. This project has been developed for a manufacturing company, whose products are fiberboard, hardboard and softboard products manufactured by a highly specialized industry using only pure wood fibers. Long changeover times used to conduct to bad results in timely delivery of orders. Therefore, in this work each element of the changeover time was analyzed to understand if it could be eliminated, moved or simplified. Implemented solutions significantly reduce setup time and improve the Company´s competitiveness.
Keywords :
industrial economics; order processing; wood products; Polish production company; changeover time; company competitiveness; die method; fiberboard product; hardboard product; manufacturing company; order timely delivery; setup time reduction; single-minute exchange; softboard product; wood fibers; Companies; Manufacturing; Milling; Production systems; Standards; fiberboard manufacturing; lean manufacuring; single minute exchange of die method;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Information Systems and Technologies (CISTI), 2015 10th Iberian Conference on
Conference_Location :
Aveiro
Type :
conf
DOI :
10.1109/CISTI.2015.7170373
Filename :
7170373
Link To Document :
بازگشت