• DocumentCode
    334076
  • Title

    RHIC sextant test: accelerator systems and performance

  • Author

    Pilat, F. ; Trbojevic, D. ; Ahrens, L. ; Brown, K. ; Connolly, R. ; Dell, G.F. ; Fischer, W. ; Kewisch, J. ; MacKay, W. ; Mane, V. ; Peggs, S. ; Satogata, T. ; Tepikian, S. ; Thompson, P. ; Tsoupas, N. ; Wei, J.

  • Author_Institution
    Brookhaven Nat. Lab., Upton, NY, USA
  • Volume
    1
  • fYear
    1997
  • fDate
    12-16 May 1997
  • Firstpage
    98
  • Abstract
    One sextant of the RHIC Collider was commissioned in early 1997 with beam. We describe here the performance of the accelerator systems during the test, such as the magnet and power supply systems, instrumentation subsystems and application software. We also describe a ramping test without beam that took place after the commissioning with beam. Finally, we analyze the implications of accelerator systems performance and their impact on the planning for RHIC installation and commissioning
  • Keywords
    accelerator RF systems; accelerator magnets; colliding beam accelerators; ion accelerators; storage rings; synchrotrons; RHIC installation; RHIC sextant test; accelerator systems; accelerator systems performance; application software; commissioning; instrumentation subsystems; power supply systems; ramping test; Accelerator magnets; Application software; Colliding beam accelerators; Colliding beam devices; Instruments; Life estimation; Magnetic analysis; Power supplies; Software testing; System testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1997. Proceedings of the 1997
  • Conference_Location
    Vancouver, BC
  • Print_ISBN
    0-7803-4376-X
  • Type

    conf

  • DOI
    10.1109/PAC.1997.749556
  • Filename
    749556