• DocumentCode
    334091
  • Title

    Status of the Fermilab fixed target program

  • Author

    Moore, C.D.

  • Author_Institution
    Fermi Nat. Accel. Lab., Batavia, IL, USA
  • Volume
    1
  • fYear
    1997
  • fDate
    12-16 May 1997
  • Firstpage
    141
  • Abstract
    Fermilab is in the midst of an 800 GeV fixed target run involving ten external beam lines and the operation of the pbar source for two additional experiments. Details of the preparation are presented with an emphasis on how changes from the last run have impacted the current run. Statistics and graphical representations show the progress toward meeting the goals of the program. An overview is presented of the external (floods...) and internal (machine instabilities...) challenges encountered during the run
  • Keywords
    nuclear bombardment targets; proton accelerators; storage rings; synchrotrons; Fermilab fixed target program; external beam lines; graphical representations; machine instabilities; pbar source; Data acquisition; Floods; Interference; Large-scale systems; Neutrino sources; Regulators; Statistics; Storms; Structural beams; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1997. Proceedings of the 1997
  • Conference_Location
    Vancouver, BC
  • Print_ISBN
    0-7803-4376-X
  • Type

    conf

  • DOI
    10.1109/PAC.1997.749571
  • Filename
    749571