DocumentCode :
334145
Title :
Status and early commissioning of the PEP-II High Energy Ring
Author :
Wienands, U. ; Reuter, E. ; Bellomo, P. ; Fisher, A. ; Gracia, J. ; Gray, R. ; Pietryka, M. ; Taylor, T. ; Bharadwaj, V. ; Iverson, R. ; Kulikov, A. ; Seeman, J.T. ; Turner, J. ; Belser, C. ; Zisman, M. ; Zholents, S.
Author_Institution :
Linear Accel. Center, Stanford Univ., CA, USA
Volume :
1
fYear :
1997
fDate :
12-16 May 1997
Firstpage :
315
Abstract :
The High Energy Ring of the PEP-II B-Factory has been constructed in the PEP tunnel. It is now beginning beam commissioning. This report will address the status of the ring systems and our experience in commissioning the systems as well as the first beam running
Keywords :
beam handling techniques; colliding beam accelerators; electron accelerators; storage rings; PEP-II B-Factory; PEP-II High Energy Ring; early commissioning; first beam running; Control systems; Electron beams; History; Laser excitation; Magnets; Pollution measurement; Power supplies; Region 2; Structural beams; Vacuum systems;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 1997. Proceedings of the 1997
Conference_Location :
Vancouver, BC
Print_ISBN :
0-7803-4376-X
Type :
conf
DOI :
10.1109/PAC.1997.749627
Filename :
749627
Link To Document :
بازگشت