DocumentCode
334245
Title
Status of 1.54 GeV ATF linac
Author
Takeda, Seishi ; Hayano, H. ; Akemoto, M. ; Naito, T. ; Matsumoto, H. ; Urakawa, J. ; Oide, K. ; Terunuma, N. ; Kubo, K. ; Hinode, F. ; Korhonen, T. ; Funahashi, Y. ; Araki, S. ; Kashiwagi, S. ; Okugi, T. ; Kagaya, S. ; Sakamoto, T. ; Takano, M.
Author_Institution
High Energy Accel. Res. Organ., Tsukuba, Japan
Volume
1
fYear
1997
fDate
12-16 May 1997
Firstpage
587
Abstract
Accelerator Test Facility (ATF) consists of a 1.54 GeV S-band linac, a beam transport line, a damping ring and an extraction beam line. A beam commissioning of the linac was performed in November 1995. A single bunch and multi-bunch beam were accelerated up to 1.43 GeV at the end of the beam transport line. The beam experiments on high-gradient acceleration, structure BPM and multi-bunch energy compensation were performed after the beam commissioning. The operation of the linac was suspended from April 1996 for the construction of the damping ring. The operation of the linac was restarted from December 1996, and the beam commissioning of the damping ring was carried out in January 1997
Keywords
booster injectors; electron accelerators; linear accelerators; 1.54 GeV; ATF linac; Accelerator Test Facility; S-band linac; beam commissioning; beam transport line; damping ring; extraction beam line; high-gradient acceleration; multi-bunch beam; multi-bunch energy compensation; Acceleration; Damping; Electron beams; Instruments; Life estimation; Linear particle accelerator; Particle beams; Space vector pulse width modulation; Structural beams; Voltage;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1997. Proceedings of the 1997
Conference_Location
Vancouver, BC
Print_ISBN
0-7803-4376-X
Type
conf
DOI
10.1109/PAC.1997.749773
Filename
749773
Link To Document