DocumentCode :
334280
Title :
Status of the high brilliance synchrotron light source BESSY-II
Author :
Jaeschke, E.
Author_Institution :
BESSY, Berlin, Germany
Volume :
1
fYear :
1997
fDate :
12-16 May 1997
Firstpage :
713
Abstract :
The high brilliance synchrotron light source BESSY II under construction at the WISTA Science and Technology Park at Berlin-Adlershof has by now passed major milestones with the completion of the injector complex. On April 3rd, 1997 a 50 MeV electron beam was stored on a stable orbit in the 10 Hz booster synchrotron. As all magnets and most of the other necessary hardware have successfully passed acceptance tests, installation of the 240 m DBA storage ring in 16-fold symmetry has started. A stored beam is expected for the 2nd quarter of 1998. The paper describes the present status of the project
Keywords :
X-ray production; electron accelerators; storage rings; 50 MeV; BESSY-II; booster synchrotron; high brilliance synchrotron light source; storage ring; Electron beams; Hardware; Lattices; Light sources; Magnets; Storage rings; Synchrotron radiation; Testing; Undulators; Vibration measurement;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 1997. Proceedings of the 1997
Conference_Location :
Vancouver, BC
Print_ISBN :
0-7803-4376-X
Type :
conf
DOI :
10.1109/PAC.1997.749813
Filename :
749813
Link To Document :
بازگشت