Title :
VUV and soft X-ray light source “New SUBARU”
Author :
Ando, A. ; Amano, S. ; Hashimoto, S. ; Kinosita, H. ; Miyamoto, S. ; Mochizuki, T. ; Niibe, M. ; Shoji, Y. ; Terasawa, M. ; Watanabe, T.
Author_Institution :
Lab. of Adv. Sci. & Technol. for Ind., Himeji Inst. of Technol., Hyogo, Japan
Abstract :
The main facility of the New SUBARU project is the 1.5 GeV electron storage ring which is under construction at the SPring-8 site in Harima Science Garden City. The first beam commissioning from the Spring-8 LINAC is scheduled at the end of March, 1998. The aim of new SUBARU is to promote industrial activities in the local area (Hyogo prefecture) and to develop experimental investigations for new light sources
Keywords :
electron accelerators; storage rings; 1.5 GeV; New SUBARU; SPring-8 site; VUV; electron storage ring; soft X-ray light source; Construction industry; Cooling; Electrons; Laboratories; Light sources; Linear particle accelerator; Radio frequency; Storage rings; Structural beams; Undulators;
Conference_Titel :
Particle Accelerator Conference, 1997. Proceedings of the 1997
Conference_Location :
Vancouver, BC
Print_ISBN :
0-7803-4376-X
DOI :
10.1109/PAC.1997.749827