• DocumentCode
    3343143
  • Title

    Testing: closing the loop through verification and validation of procedures

  • Author

    Sturdivant, M.H. ; Grider, D.A. ; Holloran, R.W. ; Johnson, R. Wayne ; Luna, S.F. ; Thomason, J.D.

  • Author_Institution
    M.H. Sturdivant & Associates Inc., Las Vegas, NV
  • fYear
    1988
  • fDate
    5-7 Oct 1988
  • Firstpage
    363
  • Lastpage
    367
  • Abstract
    The testing phase in an integrated procedures system for nuclear power plants is described. Testing through verification ensures technical accuracy and written correctness. Procedures are verified first by writers, and then by qualified reviewers through the review and approval process built into the integrated procedures system. Testing through validation ensures usability and operational correctness. Specialists independent of the procedure writer validate procedures using one or more methods: simulator, mock-up, walk-through, table-top, actual use, or reference. Testing of the whole procedures system is provided by feedback from a requirements database, periodic assessments of management programs, trainers, and users
  • Keywords
    electricity supply industry; management; nuclear power stations; technical presentation; integrated procedures system; management programs; nuclear power plants; procedures; requirements database; testing phase; trainers; users; validation; verification; written correctness; Air safety; Detectors; Feedback; Safety devices; System testing; Usability; Valves; Vents; Waste management; Water pollution;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Professional Communication Conference, 1988. IPCC '88 Conference Record. On the Edge: A Pacific Rim Conference on Professional Technical Communication., International
  • Conference_Location
    Seattle, WA
  • Type

    conf

  • DOI
    10.1109/IPCC.1988.24068
  • Filename
    24068