Title :
Status of the IUCF cooler injector synchrotron
Author :
Friesel, D.L. ; Lee, S.Y.
Author_Institution :
Cyclotron Facility, Indiana Univ., Bloomington, IN, USA
Abstract :
Construction of a 2.24 T-m, rapid-cycling booster synchrotron is nearing completion at IUCF designed to accelerate protons to 220 MeV, it will replace the k200 isochronous cyclotron as an injector of polarized light ion beams (p,d) into the Indiana Cooler. The CIS (cooler injector synchrotron) will fill the Cooler to about 1011 protons in a few seconds for research. At 30 months into the construction program, all major ring elements are fabricated, assembled, installed and in some cases, commissioned. Ring strip injection and accumulation studies began in March, 1997, ramping studies will start in June, 1997 and Cooler injection studies are planned for late 1997. The status of the construction project and initial beam injection and commissioning results are presented
Keywords :
particle beam injection; proton accelerators; storage rings; synchrotrons; 220 MeV; IUCF; accumulation; commissioning; cooler injector synchrotron; injection; ramping; rapid-cycling booster synchrotron; Acceleration; Assembly; Computational Intelligence Society; Cyclotrons; Ion beams; Optical polarization; Protons; Strips; Structural beams; Synchrotrons;
Conference_Titel :
Particle Accelerator Conference, 1997. Proceedings of the 1997
Conference_Location :
Vancouver, BC
Print_ISBN :
0-7803-4376-X
DOI :
10.1109/PAC.1997.749886