DocumentCode :
3347530
Title :
Considering bills of material in hybrid flow shop scheduling problems
Author :
Botta-Genoulaz, Valérie
Author_Institution :
Inst. Nat. des Sci. Appliquees, Villeurbanne, France
fYear :
1997
fDate :
7-9 Aug 1997
Firstpage :
194
Lastpage :
199
Abstract :
In this paper, we propose to take bills of material into account in hybrid flow shop scheduling problems. We study the scheduling of N jobs in a hybrid flow shop with V-stages and identical parallel machines. We also consider that the jobs are subject to precedence constraints. Job-precedence constraints enable the modeling of different processing units in a flow shop organization and also the modeling of bill of material aspects. Six heuristics are presented to solve this problem using the minimum makespan criterion. Numerous experiments have been undertaken to assess the performance and robustness of these new heuristics and the computational results illustrate the quality of the solution obtained
Keywords :
heuristic programming; minimisation; production control; bills of material; heuristics; hybrid flow shop scheduling problems; identical parallel machines; job-precedence constraints; minimum makespan criterion; Bills of materials; Capacity planning; Delay effects; Job shop scheduling; Manufacturing industries; Manufacturing processes; Materials requirements planning; Processor scheduling; Production planning; Robustness;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Assembly and Task Planning, 1997. ISATP 97., 1997 IEEE International Symposium on
Conference_Location :
Marina del Rey, CA
Print_ISBN :
0-7803-3820-0
Type :
conf
DOI :
10.1109/ISATP.1997.615407
Filename :
615407
Link To Document :
بازگشت