• DocumentCode
    334985
  • Title

    Design and initial commissioning of beam diagnostics for the PEP-II B factory

  • Author

    Fishe, A.S. ; Alzofon, D. ; Amettt, D. ; Bong, E.L. ; Brugnoletti, B. ; Collins, B. ; Daly, E. ; Gioumousis, A. ; Johnson, R. ; Kulikov, A. ; Kurita, N. ; Langton, J. ; McCormick, D. ; Norieg, R. ; Smith, S. ; Smith, V. ; Stege, R. ; Bjork, M. ; Chin, M.

  • Author_Institution
    Linear Accel. Center, Stanford Univ., CA, USA
  • Volume
    2
  • fYear
    1997
  • fDate
    12-16 May 1997
  • Firstpage
    2253
  • Abstract
    PEP II is a 2.2-km-circumference collider with a 2.1-A, 3.1-GeV positron ring (the Low-Energy Ring) 1 m above a 1-A, 9-GeV electron ring (the High-Energy Ring); both are designed for 3 A maximum. We describe the beam diagnostics for HER commissioning, starting in May 1997. LER commissioning will follow in 1998. The beam size and pulse duration are measured using near-UV synchrotron light extracted by grazing-incidence mirrors that must withstand 200 W/cm
  • Keywords
    colliding beam accelerators; electron accelerators; particle beam diagnostics; storage rings; 1 A; 2.1 A; 3.1 GeV; 9 GeV; High-Energy Ring; Low-Energy Ring; PEP-II B factory; beam diagnostics; collider; electron ring; grazing-incidence mirrors; near-UV synchrotron light; positron ring; Current measurement; Electrons; Laboratories; Linear accelerators; Mirrors; Particle beams; Production facilities; Pulse measurements; Strontium; Structural beams;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1997. Proceedings of the 1997
  • Conference_Location
    Vancouver, BC
  • Print_ISBN
    0-7803-4376-X
  • Type

    conf

  • DOI
    10.1109/PAC.1997.751173
  • Filename
    751173