DocumentCode :
335085
Title :
Lattice commissioning strategy for the B-Factory
Author :
Lee, M. ; Cai, Y. ; Corbett, J. ; Shoaee, H. ; Whittum, D. ; White, G. ; Yan, Y. ; Zambre, Y.
Author_Institution :
Linear Accel. Center, Stanford Univ., CA, USA
Volume :
2
fYear :
1997
fDate :
12-16 May 1997
Firstpage :
2586
Abstract :
To prepare for the PEP-II turn on, we have studied one commissioning strategy with simulated lattice errors. Features such as difference and absolute orbit analysis and correction are discussed
Keywords :
beam handling techniques; colliding beam accelerators; electron accelerators; storage rings; B-Factory; PEP-II turn on; absolute orbit analysis; absolute orbit correction; difference analysis; electron storage ring; lattice commissioning strategy; simulated lattice errors; Analytical models; Control systems; Data analysis; Energy resolution; Extraterrestrial measurements; Lattices; Magnetic analysis; Magnets; Power measurement; Power supplies;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 1997. Proceedings of the 1997
Conference_Location :
Vancouver, BC
Print_ISBN :
0-7803-4376-X
Type :
conf
DOI :
10.1109/PAC.1997.751282
Filename :
751282
Link To Document :
بازگشت