DocumentCode :
3351821
Title :
Experimental study on the water-absorption dust suppressant for the open-pit mine road
Author :
Du, Cuifeng ; Du, Jianhua
Author_Institution :
Dept. of Environ., USTB, Beijing, China
fYear :
2010
fDate :
26-28 June 2010
Firstpage :
4270
Lastpage :
4273
Abstract :
Based on the performance requirements of dust suppressant for the open-pit mine road, this paper determined that moisture-absorption dust suppressant contains hygroscopic agent, coagulation agent and accessory ingredient. The optimal formula was developed through orthogonal experiment. Moisture content in dust sample, sprayed with the dust suppressant was 13.4% after the dust sample was left untouched indoor for 21 days. Dust suppression experiment on the open-pit mine road was conducted in winter. The experimental result shows that road surface was not frozen when air temperature was as low as -12°C and moisture content in the surface soil of road was 6.2% on the 9th day after dust suppressant was sprayed.
Keywords :
absorption; air pollution; dust; moisture measurement; roads; accessory ingredient; air temperature; coagulation agent; hygroscopic agent; moisture content; open-pit mine road; time 21 day; water-absorption dust suppressant; Centralized control; Chaos; Coagulation; Copper; Moisture; Roads; Spraying; Surface soil; Temperature; Waste management; moisture content; moisture-absorption dust suppressant; open-pit mine; road dust raising;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Mechanic Automation and Control Engineering (MACE), 2010 International Conference on
Conference_Location :
Wuhan
Print_ISBN :
978-1-4244-7737-1
Type :
conf
DOI :
10.1109/MACE.2010.5535775
Filename :
5535775
Link To Document :
بازگشت