DocumentCode
3356566
Title
Optimal Operation of Cascade Hydropower Plants
Author
Guo, Shenglian ; Li, Xiang ; Liu, Pan ; Guo, Fuqiang
Author_Institution
State Key Lab. of Water Resources & Hydropower Eng. Sci., Wuhan Univ., Wuhan
fYear
2009
fDate
27-31 March 2009
Firstpage
1
Lastpage
4
Abstract
A new model is presented based on combined guide curves for optimizing hydropower production and for better storage distribution among cascade reservoirs. The model is optimized with the particle swarm optimization algorithm and storage distribution among cascade reservoirs is achieved by the storage effectiveness index method. The model is applied to the Qingjiang cascade hydropower plants and optimized combined reservoir operation chart is obtained for Shuibuya- Geheyan reservoirs. Comparing with the current design, the proposed model is capable to produce an extra amount of 201 GWh electrical energy (a 2.77% increment) and save 1067 Mm3 of flood water resources (a 38.96% reduction) annually.
Keywords
hydroelectric power stations; particle swarm optimisation; reservoirs; Qingjiang cascade hydropower plants; Shuibuya- Geheyan reservoirs; flood water resources; hydropower plants; hydropower production; particle swarm optimization algorithm; storage distribution; Decision making; Floods; Hydroelectric power generation; Optimization methods; Power engineering and energy; Power generation; Production; Reservoirs; Water resources; Water storage;
fLanguage
English
Publisher
ieee
Conference_Titel
Power and Energy Engineering Conference, 2009. APPEEC 2009. Asia-Pacific
Conference_Location
Wuhan
Print_ISBN
978-1-4244-2486-3
Electronic_ISBN
978-1-4244-2487-0
Type
conf
DOI
10.1109/APPEEC.2009.4918570
Filename
4918570
Link To Document