Title :
Flexibility in technology forecasting, planning, and implementation: a two phase idea management study
Author :
Sharma, Chitra ; Gupta, A.D. ; Sushil
Author_Institution :
Dept. of Mech. Eng., Indian Inst. of Technol., New Delhi, India
Abstract :
In this paper, modified idea writing has been used to conceptualize and generate ideas regarding flexibility planning and implementation in the Indian engineering industry. Idea writing is a group process which focuses on a single topic. This is a technique in which face to face interaction among the group is essential. The two phase idea management study summarized in this paper has resulted in the refinement of ideas to deal with the problem of flexibility in technology forecasting, planning and implementation, as well as interrelationships among the issues involved
Keywords :
engineering; planning; research and development management; technological forecasting; India; R&D management; change management; engineering industry; flexibility planning; group process; modified idea writing; technology forecasting; technology implementation; technology planning; two-phase idea management; Engineering management; Humans; Isolation technology; Mechanical engineering; Process planning; Sociotechnical systems; Systems engineering and theory; Technology forecasting; Technology management; Technology planning;
Conference_Titel :
Management of Engineering and Technology, 1999. Technology and Innovation Management. PICMET '99. Portland International Conference on
Conference_Location :
Portland, OR
Print_ISBN :
1-890843-02-4
DOI :
10.1109/PICMET.1999.808180