Title :
Maintenance work scheduling aid for nuclear power plants
Author :
Kasahara, Takayasu ; Kato, Kanji ; Ito, Tetsuo ; Sato, Takao ; Asami, Kazuo
Author_Institution :
Hitachi Ltd., Ibaraki, Japan
Abstract :
A prototype system for computer-aided scheduling of maintenance work for nuclear power plants has been developed using an artificial intelligence technique. The system functions were tested by offline simulations. This system checks for interferences between maintenance tasks or between maintenance tasks and plant operations, finds isolation procedures, and makes the optimum schedule. The hierarchical plant structure data, which consist of physical and functional form knowledge, make it possible to check for interference relations even if some data are lacking. The branch-and-bound method was used for the optimum scheduling. The system configuration is described, along with knowledge-representation and inference issues.<>
Keywords :
fission reactor operation; inference mechanisms; knowledge based systems; knowledge representation; maintenance engineering; nuclear engineering computing; nuclear power stations; optimisation; power engineering computing; power plants; scheduling; artificial intelligence; branch-and-bound method; computer-aided scheduling; functional form; hierarchical plant structure data; inference; isolation procedures; knowledge-representation; maintenance work; nuclear power plants; offline simulations; optimum schedule; physical form; plant operations; system configuration; task interference; Diagnostic expert systems; Expert systems; Indium tin oxide; Interference; Laboratories; Personnel; Power generation; Processor scheduling; Surveillance; Testing;
Conference_Titel :
Artificial Intelligence for Industrial Applications, 1988. IEEE AI '88., Proceedings of the International Workshop on
Conference_Location :
Hitachi City, Japan
DOI :
10.1109/AIIA.1988.13287