DocumentCode :
3366856
Title :
Improvement of production logistics for backend manufacturing
Author :
Winz, Gerald ; Potoradi, Jiiergcn ; Lim, Pang Tong
Author_Institution :
Infineon Technols., Regensburg, Germany
fYear :
1999
fDate :
1999
Firstpage :
81
Lastpage :
84
Abstract :
Cycle time reduction and high tool utilization are conflicting goals. This paper describes the parameters which influence this conflict and the two methods Operating Curve Management and simulation, which Infineon Technologies uses to overcome this conflict
Keywords :
integrated circuit manufacture; Infineon Technologies; backend manufacturing; computer simulation; cycle time; operating curve management; production logistics; semiconductor manufacturing; tool utilization; Application specific integrated circuits; Availability; Logistics; Manufacturing industries; Production facilities; Production systems; Productivity; Technology management; Testing; Throughput;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Semiconductor Manufacturing Conference Proceedings, 1999 IEEE International Symposium on
Conference_Location :
Santa Clara, CA
ISSN :
1523-553X
Print_ISBN :
0-7803-5403-6
Type :
conf
DOI :
10.1109/ISSM.1999.808743
Filename :
808743
Link To Document :
بازگشت