DocumentCode
3366856
Title
Improvement of production logistics for backend manufacturing
Author
Winz, Gerald ; Potoradi, Jiiergcn ; Lim, Pang Tong
Author_Institution
Infineon Technols., Regensburg, Germany
fYear
1999
fDate
1999
Firstpage
81
Lastpage
84
Abstract
Cycle time reduction and high tool utilization are conflicting goals. This paper describes the parameters which influence this conflict and the two methods Operating Curve Management and simulation, which Infineon Technologies uses to overcome this conflict
Keywords
integrated circuit manufacture; Infineon Technologies; backend manufacturing; computer simulation; cycle time; operating curve management; production logistics; semiconductor manufacturing; tool utilization; Application specific integrated circuits; Availability; Logistics; Manufacturing industries; Production facilities; Production systems; Productivity; Technology management; Testing; Throughput;
fLanguage
English
Publisher
ieee
Conference_Titel
Semiconductor Manufacturing Conference Proceedings, 1999 IEEE International Symposium on
Conference_Location
Santa Clara, CA
ISSN
1523-553X
Print_ISBN
0-7803-5403-6
Type
conf
DOI
10.1109/ISSM.1999.808743
Filename
808743
Link To Document