• DocumentCode
    3368685
  • Title

    Production scheduling systems using PROVISA

  • Author

    Marriott, Bob

  • Author_Institution
    AT&T Istel, Beechwood, OH, USA
  • fYear
    1994
  • fDate
    11-14 Dec. 1994
  • Firstpage
    522
  • Lastpage
    526
  • Abstract
    Describes the application of AT&T Istel´s simulation-based finite-capacity scheduling system, PROVISA. The strategies that differentiate a finite-capacity scheduling system from a general-purpose simulation system are described. A brief description of PROVISA and how it fits into the manufacturing environment is presented. In addition, the steps required for building, implementing and verifying a PROVISA system are given.
  • Keywords
    computer aided production planning; digital simulation; production control; scheduling; software packages; AT&T Istel; PROVISA; manufacturing environment; production scheduling systems; simulation based finite capacity scheduling system; system building; system implementation; system verification; Analytical models; Capacity planning; Computational modeling; Computer displays; Computer simulation; Electric breakdown; Job shop scheduling; Manufacturing; Processor scheduling; Production systems;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Simulation Conference Proceedings, 1994. Winter
  • Print_ISBN
    0-7803-2109-X
  • Type

    conf

  • DOI
    10.1109/WSC.1994.717302
  • Filename
    717302