DocumentCode :
3370127
Title :
Reliability study for the refurbishment of a HV/MV transformer substation
Author :
Osterholt, A. ; Prause, U. ; Zimmermann, W.
Author_Institution :
ABB Calor Emag Schaltanlagen AG, Germany
Volume :
3
fYear :
2001
fDate :
2001
Abstract :
In the main HV/MV substation of a German distribution utility, its refurbishment is upcoming. It was the objective of the presented study, to find the economic and technical optimal solution for the medium-voltage (MV) busbar-arrangement from a functional point of view. In addition to the existing configuration (double-busbar-arrangement), simplified alternatives (single-busbar- and ring-busbar-arrangement) were designed and studied by means of probabilistic reliability calculation. The results show clearly, that the simplified configurations are almost equal with regard to the provided supply reliability and also under operational aspects they cause no essential restriction. Consequently the higher investment cost of a double-busbar-arrangement cannot be justified
Keywords :
busbars; maintenance engineering; power system reliability; probability; transformer substations; Germany; HV/MV transformer substation refurbishment; busbar-arrangement; distribution utility; double-busbar-arrangement; investment cost; optimal solution; probabilistic reliability calculation; reliability study; ring-busbar-arrangement; single-busbar-arrangement;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Electricity Distribution, 2001. Part 1: Contributions. CIRED. 16th International Conference and Exhibition on (IEE Conf. Publ No. 482)
Conference_Location :
Amsterdam
ISSN :
0537-9989
Print_ISBN :
0-85296-735-7
Type :
conf
DOI :
10.1049/cp:20010799
Filename :
942941
Link To Document :
بازگشت