• DocumentCode
    3373199
  • Title

    Study on the model and balancing of automobile assembly line based on Lingo

  • Author

    Long Wu ; Xue-tao Qiao

  • Author_Institution
    Sch. of Mecharonics Eng., Zhongyuan Univ. of Technol., Zhengzhou, China
  • Volume
    9
  • fYear
    2011
  • fDate
    12-14 Aug. 2011
  • Firstpage
    4701
  • Lastpage
    4704
  • Abstract
    This paper studied two balancing problems of the automobile assembly line, built balancing mathematic model of the assembly line by the linear programming theory. The mathematic models were applied to the automobile chassis assembly line of one automobile company. It could be divided into the following steps: the assembly content was first converted into a priority relation map of the work sequence, meanwhile, the corresponding assembly data was stored into a text file for the coming reading, the LINGO8.0 was used to make program according to those two mathematic models, then the minimum working station number and optimization product time was calculated respectively, finally the balancing delay guide line was used to estimate the conditions and determine whether the balance demands were satisfied.
  • Keywords
    assembling; automobile manufacture; linear programming; production engineering computing; LINGO8.0; automobile chassis assembly line; automobile production; balancing delay guide line; linear programming software-LINGO8.0; linear programming theory; Assembly; Automobiles; Heuristic algorithms; Linear programming; Mathematical model; Production; Programming; ALB(Assembly line balancing); linear programming theory; lingo software; mathematic modeling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electronic and Mechanical Engineering and Information Technology (EMEIT), 2011 International Conference on
  • Conference_Location
    Harbin, Heilongjiang
  • Print_ISBN
    978-1-61284-087-1
  • Type

    conf

  • DOI
    10.1109/EMEIT.2011.6024085
  • Filename
    6024085