DocumentCode
3378992
Title
The grey relational analysis on building construction duration cases
Author
Shi, Huawang ; Li, Wanqing
Author_Institution
Sch. of Civil Eng., Hebei Univ. of Eng., Handan, China
fYear
2009
fDate
13-14 Dec. 2009
Firstpage
358
Lastpage
361
Abstract
There are, of course, a multiplicity of factors that will affect the time taken to construct a particular project. Using grey relational analysis, we can find the core factors influencing construction duration. The objective of this paper is to provide a tool based on grey relational analysis to aid clients and their consultants in estimating or benchmarking the construction duration. For the construction of very conformed the ¿grey¿ environment, the experiment shows grey system is the objective method of assisting contractors and subcontractors of building market precisely and quickly in reaching the most appropriate decision-making of construction duration.
Keywords
decision making; grey systems; construction duration cases; decision-making; grey relational analysis; Biomedical engineering; Biomedical measurements; Buildings; Civil engineering; Control systems; Differential equations; Educational institutions; Information analysis; Predictive models; Prototypes; building; construction duration; grey relational analysis;
fLanguage
English
Publisher
ieee
Conference_Titel
BioMedical Information Engineering, 2009. FBIE 2009. International Conference on Future
Conference_Location
Sanya
Print_ISBN
978-1-4244-4690-2
Electronic_ISBN
978-1-4244-4692-6
Type
conf
DOI
10.1109/FBIE.2009.5405849
Filename
5405849
Link To Document