• DocumentCode
    3378992
  • Title

    The grey relational analysis on building construction duration cases

  • Author

    Shi, Huawang ; Li, Wanqing

  • Author_Institution
    Sch. of Civil Eng., Hebei Univ. of Eng., Handan, China
  • fYear
    2009
  • fDate
    13-14 Dec. 2009
  • Firstpage
    358
  • Lastpage
    361
  • Abstract
    There are, of course, a multiplicity of factors that will affect the time taken to construct a particular project. Using grey relational analysis, we can find the core factors influencing construction duration. The objective of this paper is to provide a tool based on grey relational analysis to aid clients and their consultants in estimating or benchmarking the construction duration. For the construction of very conformed the ¿grey¿ environment, the experiment shows grey system is the objective method of assisting contractors and subcontractors of building market precisely and quickly in reaching the most appropriate decision-making of construction duration.
  • Keywords
    decision making; grey systems; construction duration cases; decision-making; grey relational analysis; Biomedical engineering; Biomedical measurements; Buildings; Civil engineering; Control systems; Differential equations; Educational institutions; Information analysis; Predictive models; Prototypes; building; construction duration; grey relational analysis;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    BioMedical Information Engineering, 2009. FBIE 2009. International Conference on Future
  • Conference_Location
    Sanya
  • Print_ISBN
    978-1-4244-4690-2
  • Electronic_ISBN
    978-1-4244-4692-6
  • Type

    conf

  • DOI
    10.1109/FBIE.2009.5405849
  • Filename
    5405849