DocumentCode :
3378992
Title :
The grey relational analysis on building construction duration cases
Author :
Shi, Huawang ; Li, Wanqing
Author_Institution :
Sch. of Civil Eng., Hebei Univ. of Eng., Handan, China
fYear :
2009
fDate :
13-14 Dec. 2009
Firstpage :
358
Lastpage :
361
Abstract :
There are, of course, a multiplicity of factors that will affect the time taken to construct a particular project. Using grey relational analysis, we can find the core factors influencing construction duration. The objective of this paper is to provide a tool based on grey relational analysis to aid clients and their consultants in estimating or benchmarking the construction duration. For the construction of very conformed the ¿grey¿ environment, the experiment shows grey system is the objective method of assisting contractors and subcontractors of building market precisely and quickly in reaching the most appropriate decision-making of construction duration.
Keywords :
decision making; grey systems; construction duration cases; decision-making; grey relational analysis; Biomedical engineering; Biomedical measurements; Buildings; Civil engineering; Control systems; Differential equations; Educational institutions; Information analysis; Predictive models; Prototypes; building; construction duration; grey relational analysis;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
BioMedical Information Engineering, 2009. FBIE 2009. International Conference on Future
Conference_Location :
Sanya
Print_ISBN :
978-1-4244-4690-2
Electronic_ISBN :
978-1-4244-4692-6
Type :
conf
DOI :
10.1109/FBIE.2009.5405849
Filename :
5405849
Link To Document :
بازگشت