Title :
A simulation approach to capacity expansion for the pistachio hulling process
Author :
Dessouky, Yasser ; Maggioli, Gregg ; Szeflin, Dave
Author_Institution :
Dept. of Syst. Anal., Miami Univ., Oxford, OH, USA
Abstract :
As part of a capacity expansion effort, simulation was used to evaluate the throughput of the current facility and future design options for the manufacturer of pistachios. By using simulation, Paramount Farms was able to select the design alternative that increased capacity at minimal cost. This paper describes the model used and provides details on the analysis performed.
Keywords :
computer integrated manufacturing; discrete event simulation; food processing industry; Paramount Farms; capacity expansion; capacity planning; discrete event network simulation; manufacturing simulation; minimal cost; pistachio hulling process; simulation approach; Context modeling; Discrete event simulation; Manufacturing processes; Marketing and sales; Moisture; Performance analysis; Production; System performance; Throughput; Virtual manufacturing;
Conference_Titel :
Simulation Conference Proceedings, 1994. Winter
Print_ISBN :
0-7803-2109-X
DOI :
10.1109/WSC.1994.717516