DocumentCode
3391371
Title
Scheduling model and discrete particle swarm optimization algorithm for roller annealing
Author
Song, Jiwei ; Tang, Jiafu
Author_Institution
Key Lab. of Integrated Autom. of Process Ind. MOE, Northeastern Univ., Shenyang
fYear
2008
fDate
10-12 Oct. 2008
Firstpage
770
Lastpage
775
Abstract
A two-stage no-wait hybrid flow shop scheduling problem is considered against the background of the scheduling problem of roller annealing operation in the cast steel plant of a roller corporation. An integer programming model is formulated, whose objective is to minimize the makespan. Both the discrete particle swarm optimization algorithm is proposed and the no-wait algorithm of grading is designed for solving the model. The last simulation experiment with the practical data demonstrates the feasibility and the effectiveness of the DPSO algorithm by comparisons and analyses. Furthermore, the equipment reformation strategies of the actual reference value are given which are beneficial for the policy-maker to arrange production reasonably.
Keywords
annealing; casting; flow shop scheduling; integer programming; particle swarm optimisation; rollers (machinery); steel industry; cast steel plant; discrete particle swarm optimization algorithm; integer programming model; roller annealing operation; two-stage no-wait hybrid flow shop scheduling problem; Algorithm design and analysis; Annealing; Flow production systems; Furnaces; Heuristic algorithms; Job shop scheduling; Particle swarm optimization; Processor scheduling; Scheduling algorithm; Testing;
fLanguage
English
Publisher
ieee
Conference_Titel
System Simulation and Scientific Computing, 2008. ICSC 2008. Asia Simulation Conference - 7th International Conference on
Conference_Location
Beijing
Print_ISBN
978-1-4244-1786-5
Electronic_ISBN
978-1-4244-1787-2
Type
conf
DOI
10.1109/ASC-ICSC.2008.4675465
Filename
4675465
Link To Document