• DocumentCode
    339244
  • Title

    A hierarchical method to improve the productivity of a multi-head surface mounting machine

  • Author

    Lee, S.H. ; Lee, B.H. ; Park, T.H.

  • Author_Institution
    Sch. of Electr. Eng., Seoul Nat. Univ., South Korea
  • Volume
    3
  • fYear
    1999
  • fDate
    1999
  • Firstpage
    2110
  • Abstract
    This paper considers the problem of minimizing the assembly time of multi-head surface mounting machines. The problem is decomposed into a hierarchy of related subproblems. Since all subproblems in the hierarchy are known to be of a combinatorial nature and computationally intractable, we develop heuristics which are based on dynamic programming and the nearest neighbour travelling salesman problem technique. We implement the method as a computer program and perform computer simulations. The results are compared to a heuristic that is currently in use
  • Keywords
    assembly planning; computer aided production planning; digital simulation; dynamic programming; production control; surface mount technology; assembly; computer simulation; dynamic programming; heuristics; production control; productivity; surface mounting machine; travelling salesman problem; Assembly; Computer simulation; Costs; Dynamic programming; Magnetic heads; Manufacturing automation; Nearest neighbor searches; Productivity; Surface-mount technology; Traveling salesman problems;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Robotics and Automation, 1999. Proceedings. 1999 IEEE International Conference on
  • Conference_Location
    Detroit, MI
  • ISSN
    1050-4729
  • Print_ISBN
    0-7803-5180-0
  • Type

    conf

  • DOI
    10.1109/ROBOT.1999.770418
  • Filename
    770418