DocumentCode :
339244
Title :
A hierarchical method to improve the productivity of a multi-head surface mounting machine
Author :
Lee, S.H. ; Lee, B.H. ; Park, T.H.
Author_Institution :
Sch. of Electr. Eng., Seoul Nat. Univ., South Korea
Volume :
3
fYear :
1999
fDate :
1999
Firstpage :
2110
Abstract :
This paper considers the problem of minimizing the assembly time of multi-head surface mounting machines. The problem is decomposed into a hierarchy of related subproblems. Since all subproblems in the hierarchy are known to be of a combinatorial nature and computationally intractable, we develop heuristics which are based on dynamic programming and the nearest neighbour travelling salesman problem technique. We implement the method as a computer program and perform computer simulations. The results are compared to a heuristic that is currently in use
Keywords :
assembly planning; computer aided production planning; digital simulation; dynamic programming; production control; surface mount technology; assembly; computer simulation; dynamic programming; heuristics; production control; productivity; surface mounting machine; travelling salesman problem; Assembly; Computer simulation; Costs; Dynamic programming; Magnetic heads; Manufacturing automation; Nearest neighbor searches; Productivity; Surface-mount technology; Traveling salesman problems;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Robotics and Automation, 1999. Proceedings. 1999 IEEE International Conference on
Conference_Location :
Detroit, MI
ISSN :
1050-4729
Print_ISBN :
0-7803-5180-0
Type :
conf
DOI :
10.1109/ROBOT.1999.770418
Filename :
770418
Link To Document :
بازگشت