• DocumentCode
    3395133
  • Title

    Scheduling a steel plant with timed automata

  • Author

    Fehnker, Ansgar

  • Author_Institution
    Comput.. Sci. Inst. Nijmegen, Netherlands
  • fYear
    1999
  • fDate
    1999
  • Firstpage
    280
  • Lastpage
    286
  • Abstract
    Scheduling in an environment with constraints of many different types is known to be a hard problem. We tackle this problem for an integrated steel plant in Ghent, Belgium, using UPPAAL, a model checker for networks of timed automata. We show how to translate schedulability to reachability, enabling us to use UPPAAL´s model checking algorithms
  • Keywords
    finite automata; formal verification; production control; reachability analysis; real-time systems; scheduling; steel industry; UPPAAL; model checker; reachability; schedulability; scheduling; steel plant; timed automata; Aerospace electronics; Automata; Electrical equipment industry; Information technology; Iron; Job shop scheduling; Process control; Processor scheduling; Real time systems; Steel;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Real-Time Computing Systems and Applications, 1999. RTCSA '99. Sixth International Conference on
  • Conference_Location
    Hong Kong
  • Print_ISBN
    0-7695-0306-3
  • Type

    conf

  • DOI
    10.1109/RTCSA.1999.811256
  • Filename
    811256