DocumentCode
3395148
Title
Uncertainty in Life Cycle Cost of railway track
Author
Patra, Ambika Prasad ; Söderholm, Peter ; Kumar, Uday
Author_Institution
Lulea Univ. of Technol., Lulea
fYear
2008
fDate
28-31 Jan. 2008
Firstpage
42
Lastpage
47
Abstract
Life Cycle Cost (LCC) is used as a cost effective decision support for maintenance of railway track infrastructure. However, a fair degree of uncertainty associated with the estimation of LCC is due to the statistical characteristics of Reliability, Availability and Maintainability (RAM) parameters. This paper illustrates a methodology for estimation of uncertainty linked with LCC, by a combination of Design of Experiment (DoE) and Monte Carlo simulation. The paper also includes developed maintenance cost models for track and a case study of Banverket (Swedish National Rail Administration).
Keywords
Monte Carlo methods; design engineering; life cycle costing; maintenance engineering; railways; Monte Carlo simulation; availability parameters; decision support; design of experiment; life cycle cost uncertainty; maintainability parameters; railway track infrastructure; railway track maintenance; reliability parameters; Availability; Costs; Delay estimation; Maintenance; Manufacturing; Rail transportation; Railway accidents; Risk analysis; Traffic control; Uncertainty; Design of Experiment; Life Cycle Cost; RAM; Railway Track; Simulation; Uncertainty;
fLanguage
English
Publisher
ieee
Conference_Titel
Reliability and Maintainability Symposium, 2008. RAMS 2008. Annual
Conference_Location
Las Vegas, NV
ISSN
0149-144X
Print_ISBN
978-1-4244-1460-4
Electronic_ISBN
0149-144X
Type
conf
DOI
10.1109/RAMS.2008.4925767
Filename
4925767
Link To Document