DocumentCode :
3397066
Title :
Xiangjiaba-Shanghai highest power of UHVDC ready for implementation
Author :
Yuan, Q.Y. ; Yun, Ling
Author_Institution :
State Grid Oper. Co., Shanghai
fYear :
2008
fDate :
21-24 April 2008
Firstpage :
1
Lastpage :
5
Abstract :
Xiangjiaba-Shanghai plusmn800 kV DC Transmission Project is an integral part of the Jinshajiang River Hydroelectric power transmission project. The UHVDC transmission will be mainly used to transmit the bulk power generated by this project to the Shanghai area in East China. The project interconnects Central power region of China, to which the hydroelectric power plant will be connected synchronously, to the eastern power region of China. The power will be transmitted towards the East during the peak generation period and towards the Centre when water need to conserved in the dam reservoir. The 6400 MW rated power will be transmitted to a distance of 2000 km on one single bipolar DC line plusmn800 kV. The paper describes the detailed features of this project, which is successfully designed and now is going to be implemented.
Keywords :
HVDC power transmission; hydroelectric power stations; Central power region; East China; UHVDC; Xiangjiaba-Shanghai highest power; dam reservoir; distance 2000 km; hydroelectric power plant; peak generation period; power 6400 MW; Cities and towns; Hydroelectric power generation; Power engineering and energy; Power generation; Power transmission; Reactive power; Rivers; Voltage; Water conservation; Water resources; Design principal Feature Implementation; HVDC transmission; UHVDC transmission;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Transmission and Distribution Conference and Exposition, 2008. T&D. IEEE/PES
Conference_Location :
Chicago, IL
Print_ISBN :
978-1-4244-1903-6
Electronic_ISBN :
978-1-4244-1904-3
Type :
conf
DOI :
10.1109/TDC.2008.4517107
Filename :
4517107
Link To Document :
بازگشت