• DocumentCode
    3397635
  • Title

    Analysis of deployment of control power in the Netherlands

  • Author

    Frunt, J. ; Kling, W.L. ; Myrzik, J.M.A.

  • Author_Institution
    Eindhoven Univ. of Technol., Eindhoven
  • fYear
    2008
  • fDate
    21-24 April 2008
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    Since the liberalization of the Dutch electricity market in 1998, duties and interests of market players changed from minimizing overall costs to maximizing individual profits. Naturally, this has an effect on their behavior. After the introduction of the imbalance settlement system by the transmission system operator in 2001, deployment of control power has changed over time. This paper analyses this deployment of control power to examine the behavior of market players. From the analysis it can be concluded that costs for imbalance settlement are increasing over the years. It is getting ever more difficult for new market players that have only uncontrollable renewable generation to enter the market.
  • Keywords
    power generation economics; power markets; Dutch electricity market liberalization; Netherlands; control power deployment; imbalance settlement system; renewable generation; transmission system operator; Control systems; Costs; Electricity supply industry; Power generation; Power markets; Production systems; Solar power generation; Supply and demand; Wind energy; Wind energy generation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Transmission and Distribution Conference and Exposition, 2008. T&D. IEEE/PES
  • Conference_Location
    Chicago, IL
  • Print_ISBN
    978-1-4244-1903-6
  • Electronic_ISBN
    978-1-4244-1904-3
  • Type

    conf

  • DOI
    10.1109/TDC.2008.4517140
  • Filename
    4517140