DocumentCode
339829
Title
Development of New England Power Pool´s proposed markets
Author
Fedora, P.A.
Author_Institution
ISO New England Inc., Holyoke, MA, USA
Volume
Track3
fYear
1999
fDate
5-8 Jan. 1999
Abstract
This paper summarizes the bidding procedures proposed by NEPOOL for the Energy Reserve, Automatic Generation Control (AGC), and Operable Capability markets. Experience with the Installed Capability market is also described. On October 29, 1997 FERC accepted NEPOOL´s previous filings proposing the implementation of the Installed Capability Market by November 1, 1997, but suspended its implementation for five months. The NEPOOL installed capability market became operational on April 1, 1998. On July 23, 1998, the 36th Amendment to the NEPOOL Agreement was filed by NEPOOL on to comply with the requirements of FERC´s April 20, 1998 Order. NEPOOL Participants have met throughout 1998 with ISO new England to define the proposed markets´ rules and bidding procedures. The bidding specifics are in the process of being finalized by the NEPOOL regional market operations committee. Subject to FERC approval, the target date for the proposed markets´ implementation is anticipated for December 1, 1998.
Keywords
electricity supply industry; Automatic Generation Control market; Energy Reserve market; Installed Capability market; NEPOOL; New England Power Pool proposed market development; Operable Capability market; bidding procedures; Automatic generation control; Costs; Ethics; ISO standards; Power markets;
fLanguage
English
Publisher
ieee
Conference_Titel
Systems Sciences, 1999. HICSS-32. Proceedings of the 32nd Annual Hawaii International Conference on
Conference_Location
Maui, HI, USA
Print_ISBN
0-7695-0001-3
Type
conf
DOI
10.1109/HICSS.1999.772872
Filename
772872
Link To Document