How the Lake Bonney wind farm met ESCOSA’s, NEMMCO’s, and ElectraNet’s rigorous interconnecting requirements
Author :
De Leon, John A Diaz, II ; Kehrli, Bud ; Zalay, Andy
Author_Institution :
American Supercond., Middleton, WI
Abstract :
As wind farms are installed throughout the world, each of them must meet a specific grid code to allow them to interconnect with the regional transmission system. The grid code covers such items as voltage regulation, power factor control, low voltage ride through, and high voltage ride through. This paper discusses how the Lake Bonney wind farm, that was installed on ElectraNet´s transmission system, met the ESCOSA (Essential Services Commission of South Australia) and NEMMCO (National Electricity Market Management Company of Australia) wind farm grid code using a centralized dynamic-VAR system, local transmission capacitors, and the wind turbines´ own reactive capability.
Keywords :
power capacitors; power factor; power grids; power system interconnection; transmission networks; wind turbines; ElectraNet transmission system; Electranet rigorous interconnecting requirements; Essential Services Commission of South Australia; Lake Bonney wind farm; National Electricity Market Management Company of Australia; centralized dynamic-VAR system; grid code; high voltage ride through; local transmission capacitors; low voltage ride through; power factor control; regional transmission system; voltage regulation; wind turbines; Australia; Electricity supply industry; Energy management; Lakes; Low voltage; Power system interconnection; Power system management; Reactive power; Voltage control; Wind farms; D-VAR® system; STATCOM; grid code; high voltage ride through; interconnection requirements; low voltage ride through; voltage regulation; wind farm;
Conference_Titel :
Transmission and Distribution Conference and Exposition, 2008. T&D. IEEE/PES
Conference_Location :
Chicago, IL
Print_ISBN :
978-1-4244-1903-6
Electronic_ISBN :
978-1-4244-1904-3
DOI :
10.1109/TDC.2008.4517196