DocumentCode
3399800
Title
Construction quality assurance
Author
Taylor, L.S.
fYear
2008
fDate
21-24 April 2008
Firstpage
1
Lastpage
1
Abstract
Summary form only given. Poor distribution reliability is often caused by failure to build the system to standards and/or failure to establish reliable standards. The reliability and asset management group is constantly chasing one or both of these failures. Many utility reliability programs make the system reliable later, and at a higher cost. In many respects, utility reliability programs, although necessary, are reactive in nature. This paper proposes a proactive approach to reliability...construction quality assurance. Utilities should embed reliability into the system when the costs are incremental during existing day to day work. Otherwise, failure to build the system to standards will eventually lead to the creation of future reactive reliability programs.
Keywords
fault diagnosis; power distribution reliability; asset management group; construction quality assurance; distribution reliability; reactive reliability programs; reliability management group; utility reliability programs; Asset management; Costs; Quality assurance;
fLanguage
English
Publisher
ieee
Conference_Titel
Transmission and Distribution Conference and Exposition, 2008. T&D. IEEE/PES
Conference_Location
Chicago, IL
Print_ISBN
978-1-4244-1903-6
Electronic_ISBN
978-1-4244-1904-3
Type
conf
DOI
10.1109/TDC.2008.4517259
Filename
4517259
Link To Document