• DocumentCode
    3400650
  • Title

    Using real-time outage information at Westar energy

  • fYear
    2008
  • fDate
    21-24 April 2008
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    Real-time outage information at Westar can be classified in two ways: (1) real-time data during customer outages (before outage restoration) and (2) real-time data after customers have been restored (outage closed). During the customer interruptions, all individual device outages are provided both geographically and in tabular form for internal use by dispatch, field operations personnel and company management. This application also predicts customers before they attain the CEMI target level by using statistics gained through outage analysis.
  • Keywords
    power system faults; power system restoration; CEMI target level; Westar Energy; company management; customer interruptions; customer restoration; field operations personnel; real-time outage information; statistical analysis; Circuit breakers; Information management; Information retrieval; Information systems; Medical services; Personnel; Real time systems; Substations; Vegetation; Voltage;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Transmission and Distribution Conference and Exposition, 2008. T&D. IEEE/PES
  • Conference_Location
    Chicago, IL
  • Print_ISBN
    978-1-4244-1903-6
  • Electronic_ISBN
    978-1-4244-1904-3
  • Type

    conf

  • DOI
    10.1109/TDC.2008.4517306
  • Filename
    4517306