Application research on the full-voltage synthetic making test system for high voltage switches
Author :
Xing-ming, Fan ; Ji-yan, Zou ; Min-fu, Liao
Author_Institution :
Dept. of Electr. & Electron. Eng., Dalian Univ. of Technol., Dalian
Volume :
1
fYear :
2008
fDate :
15-19 Sept. 2008
Firstpage :
117
Lastpage :
120
Abstract :
Compared with high power laboratories abroad, high voltage test level in China is to be improved. In order to meet the development requirements of modern circuit breakers and to better simulate the network, testing capabilities have to be expanded. According to the existing equipment and testing conditions of main domestic test house, a new testing circuit for synthetic making test of high voltage circuit breakers is proposed. During synthetic making test a high speed launching device is necessary, which connect the switchgear under test to current source immediately after pre-strike during closing operation. A new kind of fast making device is emphatically expounded in this research, which is composed of triggered vacuum switch (TVS) and fast vacuum circuit breaker (FVCB) with permanent magnetic actuator. Based on the synchronous closing technology, controlling strategy and its realization of synthetic making test system are fulfilled, which adopt pre-arcing current in the switch under test and the phase difference between applied voltage and making current in the range of 90plusmn27deg as the criterion for whether the launching device to act. Therefore the validity and successful rate of synthetic making test can be guaranteed. Finally, the prototype of the proposed launching device of current source at rated parameter 110 kV/63 kA and the measurement and control system for synthetic making test are fulfilled in our research. And the functional and reliability test has been carried out at Xipsilaan High Voltage Apparatus Research Institute of China.
Keywords :
circuit breakers; electromagnetic actuators; integrated circuit testing; permanent magnets; power integrated circuits; vacuum switches; fast vacuum circuit breaker; full-voltage synthetic making test system; high voltage switches; permanent magnetic actuator; synchronous closing technology; testing circuit; triggered vacuum switch; Circuit breakers; Circuit simulation; Circuit testing; Control systems; Laboratories; Switches; Switchgear; Switching circuits; System testing; Voltage;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Discharges and Electrical Insulation in Vacuum, 2008. ISDEIV 2008. 23rd International Symposium on
Conference_Location :
Bucharest
ISSN :
1093-2941
Print_ISBN :
978-973-755-382-9
Electronic_ISBN :
1093-2941
Type :
conf
DOI :
10.1109/DEIV.2008.4676733
Filename :
4676733
Link To Document :
بازگشت