DocumentCode :
3405824
Title :
A fuzzy ANP model for evaluating materiel support plan in development phase
Author :
Qu, Lili ; Kang, Rui ; Long, Jun
Author_Institution :
Dept. of Syst. Eng. of Eng. Technol., Beijing Univ. of Aeronaut. & Astronaut., Beijing, China
fYear :
2009
fDate :
10-12 Nov. 2009
Firstpage :
809
Lastpage :
813
Abstract :
Support plan evaluation plays a significant role on material system efficiency. Literature reviews indicate that research productions on support plan evaluation and defects of research angle and method still should be mentioned. In this study, support system characteristics are abstracted to determine evaluation criteria of material support plan, and the evaluation model based on fuzzy analytical network process (FANP) is presented. Analytical network process is adopted to describe complex dependence relationships between different criteria and compare their relative importance. Triangular fuzzy number is parameterized linguistic variables to handle with the vagueness and subjectivity of pairwise comparisons. The two methods are synthesized to calculate priority ranking of alternatives, and finally, an illustrative example is discussed to demonstrate the feasibility and validity of the model.
Keywords :
fuzzy set theory; materials requirements planning; complex dependence relationships; fuzzy ANP model; fuzzy analytical network process; material support plan evaluation; material system efficiency; parameterized linguistic variables; triangular fuzzy number; Costs; Decision making; Delay; Feedback; Fuzzy systems; Intelligent networks; Intelligent systems; Personnel; Space technology; Systems engineering and theory;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Grey Systems and Intelligent Services, 2009. GSIS 2009. IEEE International Conference on
Conference_Location :
Nanjing
Print_ISBN :
978-1-4244-4914-9
Electronic_ISBN :
978-1-4244-4916-3
Type :
conf
DOI :
10.1109/GSIS.2009.5408062
Filename :
5408062
Link To Document :
بازگشت