The Henday Radisson Dorsey 500 kV DC transmission line spacer damper rehabilitation project
Author
Smith, Gary W. ; Mailey, Shane
Author_Institution
Manitoba Hydro, Winnipeg, Man., Canada
fYear
2003
fDate
6-10 April 2003
Firstpage
67
Lastpage
73
Abstract
Manitoba Hydro (MH) was experiencing spacer damper failures on two ±500 kV DC transmission lines and elected to refurbish all existing dampers and install additional dampers. The work was completed in a variable climate, over terrain that included over 400 kilometres (248 miles) of swamp and woodland accessible only by air and while lines remained energized to meet system requirements. The project included respacing dampers to improve damping capabilities, completing additional line maintenance, and the development of a mathematical model to check the veracity of damper placement records.
Keywords
HVDC power transmission; damping; maintenance engineering; power overhead lines; power transmission reliability; safety; 500 kV; HVDC line; Henday Radisson Dorsey DC transmission line; Manitoba Hydro; aeolian vibration; damping capabilities; line maintenance; mathematical model; refurbishment; respacing; spacer damper failures; spacer damper rehabilitation project; vibration control; Clamps; Conductors; Damping; Failure analysis; Fasteners; Fatigue; Poles and towers; Power transmission lines; Shock absorbers; Transmission lines;
fLanguage
English
Publisher
ieee
Conference_Titel
Transmission and Distribution Construction, Operation and Live-Line Maintenance, 2003. 2003 IEEE ESMO. 2003 IEEE 10th International Conference on
Print_ISBN
0-7803-7917-9
Type
conf
DOI
10.1109/TDCLLM.2003.1196470
Filename
1196470
Link To Document