Improvement in the 500 kV substations using barehand methods without outage of power flow in Brazil´s north-south interconnection
Author
Assad, L.A.X. ; Rosa, J.E.
Author_Institution
LT´s & SE´s ENERGIZADAS LTDA
fYear
2003
fDate
6-10 April 2003
Firstpage
111
Lastpage
117
Abstract
After the construction of the substations of Miracema, Colinas and Imperatriz in 1998, several windstorms damaged some equipment. This paper shows the work developed to modify the main bus bar, in live line, using the barehand method, without outage of the power flow. The work developed consisted in changing of the 6 inches bus bar to a four conductor 954 MCM bundle, replacing the rigid connectors for expansion connectors, changing aerial jumpers and finally replacing 35 bus support polymeric insulators by porcelain insulators. We show, the sequence of activities developed along the service and photos of the service that resulted in the successful improvement of the substations.
Keywords
conductors (electric); maintenance engineering; porcelain insulators; substations; 500 kV; Brazil´s north-south interconnection; Colinas substation; Imperatriz substation; Miracema substation; aerial jumpers changing; barehand method; barehand methods; bus bar; expansion connectors; four conductor 954 MCM bundle; live line; polymeric insulators; porcelain insulators; rigid connectors replacement; windstorms; Bars; Connectors; Inductors; Integrated circuit interconnections; Load flow; Plastic insulation; Polymers; Porcelain; Substations; Switches;
fLanguage
English
Publisher
ieee
Conference_Titel
Transmission and Distribution Construction, Operation and Live-Line Maintenance, 2003. 2003 IEEE ESMO. 2003 IEEE 10th International Conference on
Print_ISBN
0-7803-7917-9
Type
conf
DOI
10.1109/TDCLLM.2003.1196476
Filename
1196476
Link To Document