Wind power plant capacity allocation in areas with limited transmission capacity
Author
Jakus, Damir ; Krstulovic, Jakov ; Vasilj, Josip
Author_Institution
Power Syst. Dept., Univ. of Split, Split, Croatia
fYear
2013
fDate
1-4 July 2013
Firstpage
862
Lastpage
867
Abstract
This paper proposes a simulation framework for assessing the possibility of wind power plant integration into the existing transmission network in an optimal manner that takes into account the wind potential at each location scheduled for WPP construction. Wind power plant capacity allocation is analyzed from the static aspect considering maximum line loading under normal system operating conditions with WPP production modeled as stochastic variable. Primal-dual interior point method with a preprocessing phase which eliminates redundant constraints is employed to solve the optimization problem.
Keywords
power distribution; power transmission; wind power plants; WPP construction; WPP production; limited transmission capacity; maximum line loading; optimization problem; primal-dual interior point method; transmission network; wind potential; wind power plant capacity allocation; Load flow; Load modeling; Optimization; Production; Resource management; Wind power generation; Wind speed; optimal capacity allocation; primal-dual interior point method; transmission network; wind power plant;
fLanguage
English
Publisher
ieee
Conference_Titel
EUROCON, 2013 IEEE
Conference_Location
Zagreb
Print_ISBN
978-1-4673-2230-0
Type
conf
DOI
10.1109/EUROCON.2013.6625084
Filename
6625084
Link To Document