DocumentCode :
3431339
Title :
Resource management by variance analysis of capacity costing
Author :
Tsung-Yu Yang ; Chen, Felicia ; Huang, Jacky ; Yang, Michelle ; Jou, Simon ; Lin, Mike
Author_Institution :
Macronix Int. Co. Ltd., Hsinchu, Taiwan
fYear :
2002
fDate :
11-11 Dec. 2002
Firstpage :
81
Lastpage :
84
Abstract :
This paper presents a framework for expanding the variance analysis of capacity costing to provide better management information for decision-making. The framework illustrates the methodology to analyze the difference between standard capacity costs and actual results to identify the variance of resource. The framework enhances the traditional variance analysis for resource management and performance evaluation. The paper uses a practical value to identify the feasibility of the framework.
Keywords :
costing; decision making; production management; resource allocation; variational techniques; capacity costing; cost management; decision making; management information; performance evaluation; resource management; variance analysis; Analysis of variance; Capacity planning; Computer industry; Costing; Costs; Decision making; Information analysis; Information management; Performance analysis; Resource management;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Semiconductor Manufacturing Technology Workshop, 2002
Conference_Location :
Hsinchu, China
Print_ISBN :
0-7803-7604-8
Type :
conf
DOI :
10.1109/SMTW.2002.1197374
Filename :
1197374
Link To Document :
بازگشت