DocumentCode
3431539
Title
Prioritized automatic material handling services in 300 mm foundry manufacturing
Author
Wang, Chia-Nan ; Liao, Da-Yin
Author_Institution
Nat. Chiao Tung Univ., Hsinchu, Taiwan
fYear
2002
fDate
10-11 Dec. 2002
Firstpage
109
Lastpage
114
Abstract
This paper presents a heuristic approach for differentiating material handling services in a highly automated environment of 300 mm foundry manufacturing. A preemptive dispatching policy, Highest Priority Job (HPJ) first, is proposed to expedite the movement of high priority products while keeping acceptable the incurred delays on regular ones. Simulation experiments based on realistic data from a local 300 mm foundry fab are conducted. Numerical results demonstrate that the proposed policy is excellent in reducing the transport delays of high priority products to some extremes. Features of HPJ are also discussed.
Keywords
digital simulation; dispatching; hoists; integrated circuit manufacture; materials handling; wafer bonding; 300 mm; foundry manufacturing; highest priority job; overhead hoist transport; preemptive dispatching policy; prioritized automatic material handling service; semiconductor wafer manufacturing; transport delay; wafer fabrication; Delay; Foundries; Inspection; Manuals; Manufacturing automation; Manufacturing processes; Materials handling; Production; Semiconductor device manufacture; Semiconductor materials;
fLanguage
English
Publisher
ieee
Conference_Titel
Semiconductor Manufacturing Technology Workshop, 2002
Print_ISBN
0-7803-7604-8
Type
conf
DOI
10.1109/SMTW.2002.1197385
Filename
1197385
Link To Document