• DocumentCode
    3432651
  • Title

    A preventive maintenance forecast method for interval triggers

  • Author

    Chih-Hong, Li ; Shih-Chao, Chang

  • Author_Institution
    Winbond Electron. Corp., Hsinchu, Taiwan
  • fYear
    2002
  • fDate
    10-11 Dec. 2002
  • Firstpage
    275
  • Lastpage
    277
  • Abstract
    There are two methods to schedule PMs: periodic trigger and interval trigger. Periodic trigger is based on working days, and can be predicted rather easily. Interval trigger is based on a certain measurement, such as the accumulated RF hours, accumulated thickness, number of wafers processed, etc. However, predicting the next PM date by interval trigger is not as easy. To solve this issue, we devised a new forecast method for interval triggered PMs. It can cope with exceptional events and plan accurate PM schedules.
  • Keywords
    forecasting theory; preventive maintenance; scheduling; forecast method; interval trigger; periodic trigger; preventive maintenance; working days; Computer integrated manufacturing; Computerized monitoring; Degradation; Employment; Job shop scheduling; Preventive maintenance; Production; Radio frequency; Thickness measurement; Volume measurement;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Semiconductor Manufacturing Technology Workshop, 2002
  • Print_ISBN
    0-7803-7604-8
  • Type

    conf

  • DOI
    10.1109/SMTW.2002.1197446
  • Filename
    1197446