• DocumentCode
    3432673
  • Title

    Factory automation migration experience for foundry fab from 200 mm to 300 mm

  • Author

    Lin, L.R. ; Chu, H.L. ; Hung, C.H. ; Lee, Y.C. ; Yeh, P.C.

  • Author_Institution
    Taiwan Semicond. Manuf. Co., Ltd., Hsin-Chu, Taiwan
  • fYear
    2002
  • fDate
    10-11 Dec. 2002
  • Firstpage
    278
  • Lastpage
    281
  • Abstract
    As the semiconductor industry increases interest in 300 mm wafer size transition, Taiwan Semiconductor Manufacturing Company (TSMC) also dedicated to participate in the 300 mm development and mass production. The goal in TSMC is to achieve or exceed the current 200 mm foundry service, which offers leading edge technology, good on-time delivery, and excellent product quality for 300 mm Fabs. To reduce the risk of 300 mm function uncertainly and shorten the development effort for new technology, two-phase development approach had been taken to set-up 300 mm fab. environment. For the detailed TSMC 300 mm fab plan, manufacturing strategy and technology transition will be discussed in this paper.
  • Keywords
    electronics industry; factory automation; foundries; mass production; semiconductor device manufacture; 200 to 300 mm; TSMC; Taiwan Semiconductor Manufacturing Company; factory automation migration; foundry fab; manufacturing strategy; mass production; product development; semiconductor industry; Computer integrated manufacturing; Delay; Dispatching; Foundries; Manufacturing automation; Materials handling; Production systems; Real time systems; Semiconductor device manufacture; Software tools;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Semiconductor Manufacturing Technology Workshop, 2002
  • Print_ISBN
    0-7803-7604-8
  • Type

    conf

  • DOI
    10.1109/SMTW.2002.1197447
  • Filename
    1197447