• DocumentCode
    3437464
  • Title

    A delay-time-based inspection model for a two-component parallel system

  • Author

    Wenbin Wang ; Xuejuan Liu ; Rui Peng ; Li Guo

  • Author_Institution
    Dongling Sch. of Econ. & Manage., Univ. of Sci. & Technol. Beijing, Beijing, China
  • fYear
    2013
  • fDate
    15-18 July 2013
  • Firstpage
    616
  • Lastpage
    619
  • Abstract
    The delay-time concept has been extensively applied in the field of maintenance modeling and optimization. Previous works have mainly focused on single-component systems and series systems with many components, which are restricted. In this paper, we propose a delay-time-based inspection model for a two-component parallel system and study the optimal inspection interval which minimizes the expected cost per unit time in long run. As a beginning, this paper considers an exponential distribution for the time-to-defect of the components. Numerical examples are presented to illustrate the model. This work will be extended to general parallel systems in the future.
  • Keywords
    cost reduction; delays; exponential distribution; industrial economics; inspection; maintenance engineering; optimisation; component time-to-defect; delay time-based inspection model; expected cost per unit time minimization; exponential distribution; maintenance modeling; optimization; two-component parallel system; Delays; Inspection; Maintenance engineering; Mathematical model; Numerical models; Reliability engineering; Safety; delay-time; failure renewal; inspection renewal; maintenance; parallel system;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Quality, Reliability, Risk, Maintenance, and Safety Engineering (QR2MSE), 2013 International Conference on
  • Conference_Location
    Chengdu
  • Print_ISBN
    978-1-4799-1014-4
  • Type

    conf

  • DOI
    10.1109/QR2MSE.2013.6625656
  • Filename
    6625656