Maintenance optimization for a system with an implemented interval of replacement activities
Author :
Wenke Gao ; Zhisheng Zhang ; Yifan Zhou ; Lei Jiang ; Wensheng Wang
Author_Institution :
Sch. of Mech. Eng., Southeast Univ., Nanjing, China
fYear :
2013
fDate :
15-18 July 2013
Firstpage :
664
Lastpage :
669
Abstract :
Most research on maintenance optimization regarded that a replacement activity is performed as soon as a planned time reaches, some other considered a time delay on replacement schedule when one job is completed or a failure comes. However, there is no existing research taking into account the influence of changes of the replacement schedule and catastrophic failures of a system on the replacement activity. In this paper, Failures of the system are divided into minor and catastrophic ones, and the replacement activity is performed either at the time when a catastrophic failure happens or in the implemented interval of the replacement activity randomly, whichever comes first. The objective of this paper is to find a constraint on the implemented interval length which is determined by engineers and an optimal implemented range of replacement activities for minimize the mean maintenance cost.
Keywords :
costing; failure analysis; maintenance engineering; optimisation; catastrophic failures; maintenance optimization; mean maintenance cost; replacement activity; replacement schedule; system failures; time delay; Distribution functions; Educational institutions; Hazards; Maintenance engineering; Numerical models; Optimization; Schedules; implemented interval; maintenance optimization; replacement policy;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Quality, Reliability, Risk, Maintenance, and Safety Engineering (QR2MSE), 2013 International Conference on
Conference_Location :
Chengdu
Print_ISBN :
978-1-4799-1014-4
Type :
conf
DOI :
10.1109/QR2MSE.2013.6625665
Filename :
6625665
Link To Document :
بازگشت