DocumentCode
3440226
Title
Notice of Retraction
The man-hour quota establishing for professionally concentrative repair of armored equipment unit based on GERT
Author
Wenhua Shi ; Chunliang Chen ; Xianming Shi
Author_Institution
Dept. of Tech. Support Eng., Acad. of Armored Force Eng., Beijing, China
fYear
2013
fDate
15-18 July 2013
Firstpage
1289
Lastpage
1292
Abstract
Notice of Retraction
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
The traditional methods of man-hour quota establishing have some deficiencies, and the deficiencies are analyzed. The corresponding GERT Net model is established through the workflow analysis of professionally concentrative repair. Through collecting the professionally concentrative repair data of some planet steering mechanism, the mean and variance of repair man-hour are obtained based on GERT. At last, according to the formula of probability estimate method, the man-hour quota of professionally concentrative repair of unit is established.
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
The traditional methods of man-hour quota establishing have some deficiencies, and the deficiencies are analyzed. The corresponding GERT Net model is established through the workflow analysis of professionally concentrative repair. Through collecting the professionally concentrative repair data of some planet steering mechanism, the mean and variance of repair man-hour are obtained based on GERT. At last, according to the formula of probability estimate method, the man-hour quota of professionally concentrative repair of unit is established.
Keywords
maintenance engineering; military equipment; probability; steering systems; GERT Net model; armored equipment unit; man-hour quota; probability estimate method; professionally concentrative repair; steering mechanism; workflow analysis; Appraisal; Exponential distribution; Gaussian distribution; Maintenance engineering; Planets; Standards; Transfer functions; GERT; man-hour quota; the professionally concentrative repair of unit; transfer function;
fLanguage
English
Publisher
ieee
Conference_Titel
Quality, Reliability, Risk, Maintenance, and Safety Engineering (QR2MSE), 2013 International Conference on
Conference_Location
Chengdu
Print_ISBN
978-1-4799-1014-4
Type
conf
DOI
10.1109/QR2MSE.2013.6625804
Filename
6625804
Link To Document