DocumentCode
3441439
Title
Notice of Retraction
The key operation ascertaining of armored equipment parts batch-repair progress for quality monitoring based on FCE
Author
Chunliang Chen ; Wenhua Shi ; Shixin Zhang
Author_Institution
Dept. of Tech. Support Eng., Acad. of Armored Force Eng., Beijing, China
fYear
2013
fDate
15-18 July 2013
Firstpage
1542
Lastpage
1545
Abstract
Notice of Retraction
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
In allusion to the deficiency of traditional key operation ascertaining methods, impact factors to measure the key of maintenance operation are analyzed from the aspect of value, and the indexes are ascertained to evaluate the key of parts batch-repair progress operation. The membership vectors of qualitative indexes are obtained through mark membership table, and the membership vectors of quantitative indexes are obtained through mountain range-shape membership function. Finally, the key operation of parts batch-repair progress is obtained through FCE (fuzzy comprehensive evaluation), and it improves the pertinence of quality monitoring.
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
In allusion to the deficiency of traditional key operation ascertaining methods, impact factors to measure the key of maintenance operation are analyzed from the aspect of value, and the indexes are ascertained to evaluate the key of parts batch-repair progress operation. The membership vectors of qualitative indexes are obtained through mark membership table, and the membership vectors of quantitative indexes are obtained through mountain range-shape membership function. Finally, the key operation of parts batch-repair progress is obtained through FCE (fuzzy comprehensive evaluation), and it improves the pertinence of quality monitoring.
Keywords
fuzzy set theory; maintenance engineering; military equipment; monitoring; FCE; armored equipment; fuzzy comprehensive evaluation; key operation ascertaining methods; maintenance operation; membership vectors; parts batch-repair progress; qualitative indexes; quality monitoring; Indexes; Maintenance engineering; Monitoring; Reliability; Safety; Standards; Vectors; fuzzy comprehensive evaluation; key operation; parts batch-repair progress; quality monitoring;
fLanguage
English
Publisher
ieee
Conference_Titel
Quality, Reliability, Risk, Maintenance, and Safety Engineering (QR2MSE), 2013 International Conference on
Conference_Location
Chengdu
Print_ISBN
978-1-4799-1014-4
Type
conf
DOI
10.1109/QR2MSE.2013.6625867
Filename
6625867
Link To Document